What should a siding contractor's website include?
- Two clear paths from the homepage, one for a planned project and one for a problem, then a page per symptom, a page per material written for your climate, separate repair and replacement pages, and whole-house before and after photography shot from the street.
Why split the homepage into two paths?
- Because the two visitors have nothing in common. One is browsing colors on a Sunday with no deadline; the other found water an hour ago and wants a phone number. A single message that tries to be aspirational and reassuring at once is neither, and the anxious visitor is usually the more valuable one.
Should stucco and siding have separate pages?
- Yes. The materials carry different question sets and the answers change with climate. Stucco brings cracking, EIFS, and moisture behind the assembly; fiber cement and vinyl bring longevity, seams, and painting. One page covering both ranks for neither and helps nobody.
What photography works best for siding?
- Full elevations shot from the sidewalk, before and after. Siding is the one trade where the product is what a neighbor sees from the street, so curb appeal is literally the purchase. Close-ups of lapping mean something to you and nothing to a homeowner.
Do I need a repair page if I mostly do replacement?
- It usually pays for itself twice. It captures a high-intent searcher you would otherwise lose, and it keeps repair traffic from polluting the campaigns and content aimed at whole-house buyers, which is one of the most common ways siding budgets get wasted.
How many city pages does a siding contractor need?
- One per community you actually work, not one per metro. Homeowners search by suburb and a footer of town names is not coverage. Tomron runs a real page for each of 16 Lower Mainland communities for exactly this reason.
Should I show photos of rot and water damage?
- On the problem path, yes, and almost nobody does. Opened walls, what was found, and what it looked like put back is the only proof that matters to a failure buyer, and it is completely absent from the gallery-and-color-selector site they are otherwise comparing you against.
How long does a siding website take to build?
- 2 to 4 weeks depending on scope. In a seasonal market it should ship ahead of the installable window rather than during it, with paid appointments carrying the calendar while it is in build.